Construction of the Route 100 Phase II Wastewater Treatment System has begun. Construction of the long awaited project has started in the Eagle Manor development (Christine Drive and Dorothy Lane). Please be prepared for and expect construction activity on these roadways. The Township's contractor will be staging equipment and materials, as needed, on the roadway and in the public right of way. Please use caution when driving in designated construction zones. Questions on construction activity can be directed to the Township at 610-458-9400.